Client
Parvalux
Location
Poole
Size
160,000 sq ft
Project Timeframe
2 Years
Inside Parvalux’s Net-Zero Commercial Building Groundworks
Parvalux tasked Jade Aden to complete a design and build project to deliver a modern headquarters and production facility, which meant they needed a reliable groundworks partner to manage the complex site. S.R.France was appointed to deliver the full scope of groundworks.

Challenges Faced
From the outset, the 8.75-acre brownfield site presented immediate obstacles. High-voltage National Grid cables and pylons crisscrossed the land. This restricted heavy machinery use and shaped the whole drainage strategy.
The initial plan featured a large attenuation tank as SuDS required. However, given the position of critical infrastructure, this posed a safety risk. In response, SR France helped redesign the drainage approach. Working with Jade Aden we delivered a large attenuation basin and swale. It was carefully excavated and shaped to ensure flow capacity while steering clear of underground utilities.
“For over two decades of working with three generations the France family, I can say my experience of this company, and the individuals, is one of honesty, professionalism , and consistent high standards.”
— Andy Hitchmough, Contracts Manager - Jade Aden Services Ltd

14,454 m²
14,454 m² of land was stripped for the main building, with 7,000 m³ of material removed
13,000 m²
A further 13,000 m² was cleared for external areas, with 5,500 m³ carted away
6,500 m²
A 6,500 m³ piling mat was formed using a mix of on-site and imported Type 1 aggregate
Services Provided
Foundations
2,237 m³ of foundations and pads excavated
239 m³ of GEN3 and 961 m³ of RC40 concrete placed, reinforced with 50 tonnes of cage steel
1,290 m³ of RC30 concrete poured across 8,785 m² of A193 mesh
Drainage
572 m of 600mm stormwater drainage installed
12 x 2,100mm manholes, 5 x 1,200mm manholes, and 1 x 1,500mm unit positioned across the network
An additional 409 m of stormwater drainage (160–450mm diameters) and 208 m of foul drainage installed
Externals
A reinforced concrete yard formed using 3,620 m³ of imported material to make up levels
Reinforced with over 3,000 m² of A393 mesh and finished with over 300 m³ of C35 concrete
Road connections and 500 m of kerbs completed to spec
The Transformation
The successful delivery of Parvalux House marked a turning point for the business. S.R.France groundwork services helped in collaboration with Jade Aden, brought together three operational sites into a new, modern headquarters. This facility covers 160,000 sq ft and has made a remarkable increase in the company's efficiency.
The facility also sets a benchmark in environmental performance. Parvalux offsets more than 343 tonnes of CO₂ emissions yearly. With thermally efficient materials and a smart layout, the project earned an A+ (-5) energy performance rating. That’s five points above the standard net zero!
The official opening in December 2023 acknowledged these achievements and was attended by key industry and government leaders.
Thinking about a similar build? Speak to our team about how we can support your next commercial or industrial project.
“This new factory represents the commitment the Maxon group has towards the future of Parvalux.”